- Solutions
- Construction sites
Zentaro Pulse for construction: daily attendance across every site
Construction crews change every week, work on several sites, and often have weak signal. Zentaro Pulse gives each site its own location circle, lets the phone app save punches offline and send them later, and gives contractors and visitors a QR pass. Supervisors mark attendance for workers without phones. Launching 2027.
- Launching 2027, not on sale yet
- Made by Zentaro LLP in Pune, India
- Phone, QR code, shared tablet or NFC badge
- Free tools and templates, no sign-up
What goes wrong when a site runs on notebooks
Daily wage means a daily count
Many workers are paid for each day they turn up. If the head count is off by five people across a week, the cost is real. A supervisor with a pencil and a wet page cannot be sure of the count.
Crews belong to contractors, not to you
A mason team may be sent by a contractor and the helpers by another. Each contractor sends his own list. You pay on a list you never saw being made.
Signal is poor behind the hoarding
Basements, new towers and remote road projects have patchy signal. An app that needs a network at the moment of punch fails exactly where it is needed.
People move between sites in a week
A carpenter works at the tower on Monday and at the clubhouse on Thursday. A single list per site makes it hard to see where he was and for how long.
How work runs on a building site
Most sites run one long day shift, often from seven or eight in the morning with a lunch break, six days a week. Concrete pours, finishing work and deliveries sometimes push crews into the night. Gangs are paid by the day, by the task, or by a mix.
Pulse treats each site as its own location with its own work week, so a site that works Sundays and a site that does not can sit side by side. When a worker is moved to another site, a location-change request records the move and who approved it.
Ways to mark attendance that suit a site
Phone app that works offline
Supervisors and skilled workers can punch by phone inside the site circle. If the network is down, the phone saves the punch and sends it when the signal is back. A punch that arrives more than 72 hours late goes to review.
QR pass for contractor crews and visitors
Each contractor, vendor and visitor can be given a QR pass. The gate tablet reads it, so you see who came in even when they are not on your payroll.
Supervisor marks for workers without phones
A supervisor can mark attendance on behalf of a worker who has no phone. The record shows who marked it, so it can be checked later.
Pulse features that fit a building site
- Contract worker attendance: Daily-wage workers, contractors and visitors, each with the right kind of record.
- Many-site attendance: A work week for each site, workers assigned to sites, and a request when someone is moved.
- Geofence attendance: A circle with a radius in metres around the site, so a punch is tied to the place.
- Attendance reports: A monthly register by site and by worker, ready to download as a CSV or Excel-ready file for the wage sheet.
- Attendance fraud checks: Rules look for a fake location, a replayed punch and travel that is not possible between two punches.
Example: a tower with three contractor crews
This is an example, not a result from a real site. A residential tower has a plastering crew, a tile crew and a plumbing crew, each sent by a different contractor. The site engineer gives each contractor a pass for the day and sets the tablet at the gate. At eight in the morning the tablet has read forty-one passes.
In the basement the signal is weak, so two supervisors punch by phone and the punches wait on the phone. They arrive at lunch when the supervisors walk out. At the end of the week the engineer downloads the register for the site and sends the plumbing count back to the contractor to check against his own list.
Questions people ask
Does Zentaro Pulse work when the site has no network?
The phone app saves punches offline and sends them when the connection returns. A punch that arrives after more than 72 hours goes to review. Do not rely on any other device working offline.
How do we record daily-wage workers who have no phone?
A supervisor can mark attendance for them, and the record shows who did it. You can also issue a QR pass that the gate tablet reads.
Can one worker be assigned to different sites?
Yes. Each site has its own location and work week, and a location-change request records a move and who approved it. Reports can be viewed by site.
Does it track workers around the site all day?
No. There is no background tracking and no route map. If your company turns on auto clock-out, the app checks the position while the app is open and the worker is clocked in.


